100 kW solar power plant: cost and EPC scope

A commercial 100 kW PV project's budget depends on the roof or land, equipment, grid connection and EPC scope. This page explains the preliminary estimate; a project-specific quotation follows a site assessment.

01 / EPC

What affects the price

A price per kilowatt without site assumptions can be misleading. Compare quotations with matching work scope, taxes and connection requirements.

01

Equipment

PV modules, inverters, mounting systems, cabling, switchgear, protection, metering and monitoring.

02

Site conditions

Usable roof or land, structural checks, shading, access and any strengthening or groundwork.

03

Grid connection

Point of connection, cable distance, technical conditions, required upgrades and export restrictions.

04

Delivery and contingency

Surveys, engineering, installation, testing, commissioning, logistics and risk allowances.

02 / CAPEX

Illustrative budget — not a fixed offer

The homepage contains an illustrative 100 kWp grid-connected rooftop example of KZT 30 million excluding VAT and batteries. It assumes a suitable roof and limited grid works. It is not a fixed price or an offer.

View the assumptions and sample breakdown ↗
03 / INPUT DATA

Data for a preliminary quotation

We can begin with essential information and request more detail after the first assessment.

Request a 100 kW quotation ↗
  • Electricity use for at least three months and the current tariff
  • Site address and available roof or land dimensions
  • Electrical single-line diagram, contracted capacity and grid conditions if available
  • Operating schedule, desired capacity and indicative implementation date
04 / FAQ

Frequently asked questions

Will 100 kW replace all electricity purchases?

Not necessarily. Coverage depends on seasonal production, hourly demand and grid constraints.

Does the sample include batteries?

No. The illustration is a grid-connected system without BESS or backup power. Storage is priced separately.

Can payback be calculated from the tariff alone?

No. Generation, self-consumption, capital cost, operating expenses and taxes also matter.

How do I request a project-specific price?

Share your demand, tariff, site and connection details. We will identify assumptions and prepare a preliminary estimate.