We design and build ground-mounted, rooftop and carport solar systems for businesses, from energy analysis and grid connection conditions to commissioning, monitoring and maintenance.

100 kW–10 MWindustrial projects
Smart EPCdata-driven engineering
24/7 SCADAtransparent performance monitoring
01 / SOLUTIONS

We design around your site,
your load and your constraints

We first assess your load profile, grid connection and site. We then size a system to reduce electricity costs without installing unnecessary capacity.

01

Rooftop solar

For factories, warehouses, retail and office buildings with daytime electricity demand.

  • No additional land needed
  • Efficient installation
  • Integration with the existing connection
Explore rooftop solar
02

Ground-mounted solar

For businesses with available land and demand for larger capacity.

  • Optimised module orientation
  • Easy maintenance access
  • Phased expansion
Explore ground-mounted solar
03

Solar carport

Solar generation and covered parking in one engineered structure.

  • Dual use of parking space
  • EV charging readiness
  • Visible ESG benefits
Explore solar carports
02 / INDUSTRIES

Solar power where
energy drives production

We focus on sites with steady daytime demand, a clear electricity tariff and space for rooftop, ground-mounted or carport solar.

IND

Industry

Factories and production sites with a stable daytime base load.

Rooftop · ground-mounted · BESS
FMCG

Food production

Production lines, refrigeration and continuous electricity demand.

Rooftop · zero export
LOG

Warehousing and logistics

Large roof areas and generation that aligns with working hours.

Rooftop · carport · EV charging
CEM

Cement and materials

High electricity demand and opportunities for phased development.

Ground-mounted · PPA · SCADA
RET

Commercial property

Shopping and business centres with substantial daytime demand.

Rooftop · carport
AGR

Agribusiness

Processing, irrigation, cold storage and remote facilities.

Solar · BESS · hybrid
03 / DELIVERY MODELS

One solar plant.
Different investment models

We choose the financing structure after energy screening: who invests, who owns the asset and how the customer receives the economic benefit.

02No upfront CAPEX

Onsite PPA / BOOT

An investor or SPV finances, builds and operates the solar plant. The customer pays for metered solar electricity.

Investment
investor / SPV
Ownership
investor, with a transfer option
Benefit
savings compared with the grid tariff
03Reduced project risk

Phased development

Energy screening, site surveys and FEED establish a technically and financially sound project before an EPC decision.

First stage
screening and concept
Decision
CAPEX, PPA or phased EPC
Outcome
investment decision package
In every modelSCADA, O&M, reporting and performance-ratio monitoring after commissioning.
04 / PROJECT JOURNEY

From the first data point
to the first kilowatt-hour

Each stage produces a verifiable outcome: a report, design package, test record or commissioned system.

  1. 01

    Energy screening

    We review three months of consumption, tariff, capacity allocated under the technical conditions and load profile to estimate an appropriate solar capacity.

    2–5 days
  2. 02

    Site survey

    We assess topography and ground conditions for land, and structural capacity, roof condition and shading for rooftops; we identify connection points.

    3–10 days
  3. 03

    Grid conditions and design

    We develop the technical solution, protection, cable routes, metering/SCADA and detailed design.

    3–8 weeks
  4. 04

    Procurement and construction

    Modules, inverters, structures, cables and protection; installation with QA/QC and HSE controls.

    6–14 weeks
  5. 05

    Testing and commissioning

    Testing, relay protection settings, synchronisation, staff training and as-built documentation.

    1–3 weeks
  6. 06

    Monitoring and O&M

    24/7 generation monitoring, scheduled inspections, thermal imaging, cleaning and alarm response.

    ongoing
05 / SCADA

Always
connected

SCADA collects data from inverters, meters, weather stations and protection systems. Customers see generation and equipment status while the service team receives alarms and identifies faults.

GenerationAlarmsWeather dataReports
LIVE PLANT ONLINE
CURRENT OUTPUT382.6 kW+8.4% vs plan
Today2.31 MWh
Availability99.4%
CO₂ avoided1.7 t
06 / PROJECT SCENARIOS

A design shaped by your
demand and site

These illustrative scenarios show options for industrial and commercial sites. We refine every design after reviewing demand, grid connection and site conditions.

Industrial facilityGround-mounted configuration
504 kW

Ground-mounted solar for three load groups

Separate connections for the gatehouse, outdoor lighting and utilities. We assess how to allocate solar generation without affecting critical processes.

  • approximately 800 modules at 630 W
  • Almaty Region
Retail and logisticsRooftop configuration
≈600 kW

Rooftop pilot with daytime demand

We assess roof area, load profile and potential to scale the solution across other sites.

  • prioritising on-site consumption
  • scalable architecture
ManufacturingPPA scenario
≈3,5 MW

Portfolio of three production sites

An onsite PPA is under consideration: the investor finances the asset and the customer purchases solar electricity under an agreed pricing formula.

  • three separate sites
  • long-term O&M model
Cement productionPhased configuration
up to 5 MW

Ground-mounted plant for an energy-intensive facility

We assess the site, connection and phased construction for a stable industrial load.

  • option for phased construction
  • SCADA and PR monitoring
Site-specific assessmentCapacity, design and commercial model follow an energy screening and review of the site's data.
07 / QUICK ESTIMATE

Explore the scale
of your solar plant

Enter capacity, tariff and demand to see the approximate size of your plant and its potential financial impact.

Please noteFinal design depends on load profile, technical conditions, shading and site conditions.
kW
KZT/kWh
kWh
50 kW10 MW
Installation type
630 W modules794pcs
Approximate area8 000m²
Annual generation675–750MWh
Potential share of annual demand24%
Upper estimate of annual savings28,6–31,7million KZT
Implementation time4–7months

Savings are capped by the site's annual consumption. This is an upper estimate: hourly alignment, grid constraints and maintenance costs require site data. This is not a commercial offer.

Share project details ↓
07A / ILLUSTRATIVE ASSESSMENT

What an assessment
can show for your site

An illustrative rooftop solar project for a business in Kazakhstan. The assumptions explain the method; they are not a forecast or commercial offer.

Assumptions

Plant capacity
500 kWp
Site demand
250,000 kWh/month
Example tariff
42.3 KZT/kWh
Specific annual yield
1,350 kWh/kWp
Share of generation consumed on site
80 %

For a real project, we recalculate yield using coordinates, orientation, shading and losses, and self-consumption using the hourly load profile. About PVGIS solar data ↗

Results under these assumptions

Expected annual generation675,000 kWh500 × 1 350
Consumed on site540,000 kWh675 000 × 80 %
Share of annual demand covered18 %540 000 ÷ (250 000 × 12)
Lower purchased electricity costs≈ 22.8 million KZT/year540,000 × 42.3 KZT/kWh

The example excludes CAPEX, maintenance, tax, tariff changes and any value of electricity not consumed on site. Payback follows a project cost estimate. Actual generation and savings may differ.

Assess my site ↗
08 / QUALITY ASSURANCE
IECequipment and testing to international standards
HSEsafety plan before site work begins
QA/QCincoming inspection, checklists and as-built records
PRperformance-ratio tracking after commissioning
09 / FAQ

Answers to common questions

What is the solar plant's payback period?+

For some projects in Kazakhstan without BESS, around four years is an indicative payback. Actual results depend on construction cost, tariff, load profile, on-site consumption and financing. Energy screening provides base and conservative cases, projected cash flow and simple payback.

What warranties does the customer receive?+

The package includes manufacturers' warranties for modules, inverters and other equipment, a warranty for EPC works, testing records and as-built documents. Specific terms depend on the chosen equipment and the contract.

What does after-sales service include?+

SCADA monitoring, alarm handling, remote diagnostics, scheduled inspections, thermal imaging, generation monitoring and equipment maintenance. Inspection intervals and response times are set in the service SLA.

How much can electricity costs fall?+

Savings come from replacing purchased electricity with solar energy consumed on site. We assess this using 12 months of demand, hourly load, tariff and expected generation, reporting kWh, annual KZT savings and the share of demand covered.

10 / ABOUT US

Engineering. Data.
Accountability.

QuantAI Energy develops solar projects for commercial and industrial sites in Kazakhstan and Central Asia. We assemble project teams around each site's capacity, conditions and customer requirements.

Full project delivery

Industrial solar projects under one accountable team

Energy Screening · Engineering · Procurement · Construction · O&M

We manage projects from energy analysis and financial modelling through design, construction, commissioning and maintenance.

Delivery model

We bring together specialists and coordinate the customer, designers, suppliers and installation team.

01

Development

Site data, economics, EPC or PPA model and partner coordination.

02

Engineering

Engineering design, structures, electrical systems, grid conditions and connection.

03

Construction

Procurement, HSE, QA/QC, installation, testing and as-built documentation.

04

Operations

SCADA, monitoring, scheduled maintenance, SLA and performance-ratio tracking.

NEXT STEP

Share a brief
about your site

Provide your contact details, electricity consumption for the last three months and any site information you have. We will receive your enquiry and contact you.

Electricity consumption for each of the last three months, kWh
Enter monthly consumption if available. No bills are required.