Rooftop solar
For factories, warehouses, retail and office buildings with daytime electricity demand.
- No additional land needed
- Efficient installation
- Integration with the existing connection
QUANTAI ENERGY • SOLAR EPC / SCADA / O&M
We design and build ground-mounted, rooftop and carport solar systems for businesses, from energy analysis and grid connection conditions to commissioning, monitoring and maintenance.
We first assess your load profile, grid connection and site. We then size a system to reduce electricity costs without installing unnecessary capacity.
For factories, warehouses, retail and office buildings with daytime electricity demand.
For businesses with available land and demand for larger capacity.
Solar generation and covered parking in one engineered structure.
We focus on sites with steady daytime demand, a clear electricity tariff and space for rooftop, ground-mounted or carport solar.
Factories and production sites with a stable daytime base load.
Rooftop · ground-mounted · BESSProduction lines, refrigeration and continuous electricity demand.
Rooftop · zero exportLarge roof areas and generation that aligns with working hours.
Rooftop · carport · EV chargingHigh electricity demand and opportunities for phased development.
Ground-mounted · PPA · SCADAShopping and business centres with substantial daytime demand.
Rooftop · carportProcessing, irrigation, cold storage and remote facilities.
Solar · BESS · hybridWe choose the financing structure after energy screening: who invests, who owns the asset and how the customer receives the economic benefit.
The customer finances construction directly or through a lender and owns the plant after commissioning.
An investor or SPV finances, builds and operates the solar plant. The customer pays for metered solar electricity.
Energy screening, site surveys and FEED establish a technically and financially sound project before an EPC decision.
Each stage produces a verifiable outcome: a report, design package, test record or commissioned system.
We review three months of consumption, tariff, capacity allocated under the technical conditions and load profile to estimate an appropriate solar capacity.
We assess topography and ground conditions for land, and structural capacity, roof condition and shading for rooftops; we identify connection points.
We develop the technical solution, protection, cable routes, metering/SCADA and detailed design.
Modules, inverters, structures, cables and protection; installation with QA/QC and HSE controls.
Testing, relay protection settings, synchronisation, staff training and as-built documentation.
24/7 generation monitoring, scheduled inspections, thermal imaging, cleaning and alarm response.
SCADA collects data from inverters, meters, weather stations and protection systems. Customers see generation and equipment status while the service team receives alarms and identifies faults.
These illustrative scenarios show options for industrial and commercial sites. We refine every design after reviewing demand, grid connection and site conditions.
Separate connections for the gatehouse, outdoor lighting and utilities. We assess how to allocate solar generation without affecting critical processes.
We assess roof area, load profile and potential to scale the solution across other sites.
An onsite PPA is under consideration: the investor finances the asset and the customer purchases solar electricity under an agreed pricing formula.
We assess the site, connection and phased construction for a stable industrial load.
Enter capacity, tariff and demand to see the approximate size of your plant and its potential financial impact.
Savings are capped by the site's annual consumption. This is an upper estimate: hourly alignment, grid constraints and maintenance costs require site data. This is not a commercial offer.
Share project details ↓An illustrative rooftop solar project for a business in Kazakhstan. The assumptions explain the method; they are not a forecast or commercial offer.
For a real project, we recalculate yield using coordinates, orientation, shading and losses, and self-consumption using the hourly load profile. About PVGIS solar data ↗
The example excludes CAPEX, maintenance, tax, tariff changes and any value of electricity not consumed on site. Payback follows a project cost estimate. Actual generation and savings may differ.
Assess my site ↗For some projects in Kazakhstan without BESS, around four years is an indicative payback. Actual results depend on construction cost, tariff, load profile, on-site consumption and financing. Energy screening provides base and conservative cases, projected cash flow and simple payback.
The package includes manufacturers' warranties for modules, inverters and other equipment, a warranty for EPC works, testing records and as-built documents. Specific terms depend on the chosen equipment and the contract.
SCADA monitoring, alarm handling, remote diagnostics, scheduled inspections, thermal imaging, generation monitoring and equipment maintenance. Inspection intervals and response times are set in the service SLA.
Savings come from replacing purchased electricity with solar energy consumed on site. We assess this using 12 months of demand, hourly load, tariff and expected generation, reporting kWh, annual KZT savings and the share of demand covered.
QuantAI Energy develops solar projects for commercial and industrial sites in Kazakhstan and Central Asia. We assemble project teams around each site's capacity, conditions and customer requirements.
Energy Screening · Engineering · Procurement · Construction · O&M
We manage projects from energy analysis and financial modelling through design, construction, commissioning and maintenance.
We bring together specialists and coordinate the customer, designers, suppliers and installation team.
Site data, economics, EPC or PPA model and partner coordination.
Engineering design, structures, electrical systems, grid conditions and connection.
Procurement, HSE, QA/QC, installation, testing and as-built documentation.
SCADA, monitoring, scheduled maintenance, SLA and performance-ratio tracking.
NEXT STEP
Provide your contact details, electricity consumption for the last three months and any site information you have. We will receive your enquiry and contact you.