1 MW solar power plant: construction cost and scope

For a 1 MW industrial PV project, site characteristics, demand, connection conditions and technical scope determine the estimate. CAPEX depends on the chosen equipment, electrical works and construction requirements.

01 / EPC

What makes up EPC CAPEX

At megawatt scale, grid connection and civil works are material cost drivers. Quoting one universal price without site inputs would be unreliable.

01

Surveys and engineering

Topographic data, geotechnical investigation where required, layout, electrical design and project documents.

02

PV equipment

Modules, inverters, structures, DC/AC cables, switchgear, monitoring and controls.

03

Grid connection

Technical conditions, protection, transformers, power lines, metering and required approvals.

04

Construction and start-up

Site works, foundations, installation, testing, commissioning, logistics and contingency.

02 / CAPEX

Why the budget needs a site assessment

Two plants rated at 1 MW may require very different grid extensions, earthworks, mounting systems and approvals. A useful preliminary EPC proposal must state included and excluded scope, tax treatment and assumptions.

Review design and engineering scope ↗
03 / INPUT DATA

Inputs for a 1 MW feasibility review

We can prepare an initial assessment from the information available and identify missing inputs.

Request a 1 MW estimate ↗
  • At least three months of electricity consumption, tariff and operations
  • Site coordinates, layout and land or roof rights
  • Grid technical conditions, single-line diagram and point of connection
  • Project objective: self-consumption, grid export or hybrid configuration
04 / FAQ

Frequently asked questions

How much land does a 1 MW system require?

Area depends on technology, layout, setbacks and terrain. We assess a location after receiving site plans or coordinates.

Does 1 MW cover a factory's electricity demand?

It depends on demand patterns and solar generation. Nameplate capacity is not guaranteed hourly output.

Is battery storage included?

The base case is PV without BESS. Storage and resilience requirements are costed separately.

When can you give a firm EPC offer?

After surveys, connection conditions, engineering scope and equipment specifications have been agreed.

QUANTAI ENERGY / EPC

Request a preliminary 1 MW EPC proposal

We will review the site, load and grid constraints and make the assumptions transparent.

Request a 1 MW estimate